
2022/04/08
UAE TDRA Updated The Label Requirement
New TDRA label has been implemented for new type approval certificates or renewal certificates issued after March 1, 2022.
Read more >

2022/04/06
SGS Worldwide Certification News - 22004
On January 13, 2022, Telecommunication Engineering Centre (TEC) has announced the test reports/results issued by the labs which accredited by ILAC signatories from non-border sharing countries will only accepted, otherwise the sample for local test will be required.
Read more >

2022/03/11
Phison Strengthens its Position in Automotive Storage Market: Secures Automotive Functional Safety Certification ISO 26262
Read more >
2022/02/24
Andes Technology Is the First RISC-V Vendor to Accomplish ISO 26262 Functional Safety ASIL D Development Process Certification with SGS-TÜV Saar
Read more >

2022/01/11
Saudi Arabia CITC established new WLAN regulations which has been enforced since 2022
CITC updated the WLAN regulation with new technical conditions. According to the regulations, WLAN equipment shall be type approved by CITC prior to importation to the Kingdom and must adhere to CITC’s published technical specifications. In addition, CITC is permitting the use of specific WLAN Frequency Bands under the light licensing regime.
Read more >

2021/12/29
SGS Worldwide Certification News - 22001
In the new Acts, ANATEL defines new standards and tests that must be applied to products that operate 4G-NBlot and 5G. Going forward, laboratories and Designated Certification Bodies (DCBs) must request tests according to these new standards depending on the product type. The Acts also include an important reservation that must be applied to all products that use 4G bands for 5G operations, in that they must be retested under the 5G functional tests. Certificates for these retested products must be updated within a maximum of 6 months.
Read more >

2021/10/28
SGS Worldwide Certification News - 21011
State Radio Regulatory Commission of the People's Republic of China (SRRC) issued Notice No. [2021] No. 129 on October 13, 2021, strengthening the technical requirement of 2400-2483.5MHz, 5150-5350MHz and 5725-5850MHz frequency bands.
Read more >

2021/10/15
India Telecommunication Engineering Centre (TEC) issued an announcement about products listed under Phase III & IV
India Telecommunication Engineering Centre (TEC) issued an announcement on September 22, 2021, in which the products listed under MTCTE Phase III & IV, the acceptance date of application on portal and the enforcement date are mentioned. For Phase IV products, you may refer to the following table to decide whether to apply for a provisional certificate first or a regular certificate.
Read more >

2021/09/28
SGS Taiwan invested TWD 100M to establish a testing center for semiconductor process gas analysis and future R&D
Process gases as raw materials have played an important role in the semiconductor fabrication, and they are becoming more and more important in other semiconductor related industries such as flat panel devices (LCD, LED, OLED), photovoltaics and other microelectronic production.
Read more >